LL 150
Qualifications required for individuals performing gas work
LL 151
Requires that the final inspection for gas piping must be performed by the NYC DOB
LL 152
Requires periodic inspection of existing gas piping systems
LL 153
Requires the notification and posting of instructions related to what procedures residential tenants must follow in the event of a gas emergency
LL 154
Requires that both the utility company and the property owner must notify the DOB within 24 hours of having the gas service shut off for a building due to a hazardous condition
LL 157
Addresses the mandatory installation of carbon monoxide, smoke, and natural gas alarms for residential occupancies
LL 159
Designates violations for gas piping systems as immediately hazardous
Federal/State Operator Qualification Requirements (Covered Tasks 86/87)